Pre-Release

Start release planning immediately after each release according to the section Post-Release below - maybe there is actually not pre-release phase - to be verified

  •  

Content

Table of Contents
minLevel1
maxLevel7
excludeContent

Checklist

Freeze Phase

  •  Create the release on the QA server  Inform developer of the freeze
  •  All relevant tickets are assigned to epics
  •  Create the release branchesrelease instance using the released components
  •  Define the version number of the modules based on semantic versioning
  •  All relevant tickets are assigned to epicsCreate the release branches
  •  Check the Continuous Integration in details
  •  Inform the implementers about the User Acceptance Test (UAT) timeline (Beta version)
  •  
  • Add user account on the
  • Create the release on TestLink (QA server)

Alpha Phase

  •  Create release instance using the released modules Perform some basic testing / Developer tests
    •  Claim: create/review/process
    •  Registration: create/update familly/insuree
    •  Enrollment: create policy and contribution
    •  Meta data: create/update location/product/user/role/pricelist/itemslist/servicelist
  •  Make sure defects are assigned to developers
  •  Do developer tests
  • were fixed by developers
  •  Release: openIMIS Instance and Wiki page are up to date

Beta Phase

  •  Update the PyPi, NPM module when code change was doneOfficially announce the start of User Acceptance Tests (UAT)
  •  Check that the release instance use the latest modules
  •  Do User-Acceptance-Testing (UAT)
    •  Add user account on the QA server

RC Phase

  •  Ensure deployability with Docker (Quickstart installation guide / Docker compose)

RC Phase

  •  Update the PyPi, NPM module when code change was done
  •  Check that the release instance use the latest modules
  •  Start collecting the documentation from developers

GA Phase

  •  Merge release branches with main
  •  All affected repositories (GitHub, Pypi.org, http://npmjs.com , etc.) are tagged and Create release in GitHub, versioned according to Version management and contain containing complete release notes on GitHub
  •  All source components link to the correct repository on GitHub, have the correct version, valid release notes and are reasonably named to similiar repositories / package manager
  •  Publish the release branch on PyPi and NPM (required to check the packaging)
  •  Analyze linked issues as an anonymous user
  • (should publish automatically the release on PyPi and NPM)
  •  Update the openimis.json in assemblies main branch to use only official version (not RC)
  •  Update demo server (mark maintenance window on Demo: openIMIS)
  •  Demo: openIMIS Instance and Wiki page are up to date
  •  Mark all tickets in release as “Done” or push to the next release
  •  Check that Installation Guide supports installation of the latest release
  •  Check and update Release 2022-10
    •  All links on the release page and release sources page are working and are helpful; Dates are correct and the status is “GA”
    •  
    All assigned tickets are marked “Done” or pushed to the next release
    • Analyze linked issues as an anonymous user
    •  “Highlights” of the release are written and coherent
  •  Ensure that the Release page points to the correct “Release Sources Page” e.g. Sources Release 2022-04 for Check and update Sources Release 2022-04
    •  
    Update the openimis.json to use only official version (not rc) on assembly modules
  •  Update demo server
  •  Installation guide / Installation and Country Localisation supports installation of the latest release
    • All source components link to the correct repository on GitHub, have the correct version, valid release notes and are reasonably named to similar repositories / package manager
  •  Formulate release notes in current release (Releases) and forward it to co-ordination desk for promotion (e.g. newsletter, Twitter)
  •  Check and update the Wikipedia page, that it refers to the latest release (number) and reflects the technical facts of openIMIS correctly

Post-Release

Start preparing the next release immediately after the current release.

Following need to be integrated

Installation Guide / Configuration / Other

Sandbox Landscape Sandbox Landscape

  •  Prepare the next release
    •  Create the relevant epics for the new release (e.g. Release 2022-10 ) in Jira and add them to the release page
    •  Create the release page (e.g. Release 2022-10 ) for the following release and make sure it appears correctly on Releases
      •  Define milestones according to the framework in Releases