The transformation from current architecture to the modular architecture will be iterative and incremental.

Iterative

At the end of each iteration, a production-ready version of openIMIS will be delivered.

To be production-ready implies that, at each iteration:

Each project will have the choice to join the new openIMIS platform at that iteration or not.

Incremental

The aim is to cover all current openIMIS features (of each implementation) with plugins in the (new) openIMIS.

However, not everything will be ready at first iteration. To ensure a production-ready delivery, openIMIS will, as a consequence, be built upon proxy plugins to (legacy) implementation.

Proxy plugins will be developed in the various layers and will be replaced once the new implementation is ready.


Transformation Phases

The transformation will be accomplished in 3 phases. Each phase delivers a coherent and production-ready instance of openIMIS, allowing each project to adapt the timing to own constraints.